‹ 首页

growing-outside-in-systems

@lexler · 收录于 昨天 · 上游提交 1 周前

Drive feature development using Outside-In TDD with Hexagonal Architecture. Design emerges through inline code, in-memory fakes, interface extraction, and deferred I/O. Use when building features, writing tests, or structuring backend services. Triggers on: TDD, outside-in, hexagonal, ports and adapters, emergent design, acceptance test, component test, walking skeleton, in-memory fakes, component, contract test, adapter, fast tests, sub-second feedback. Language-agnostic (Go, Rust, Python, TypeScript, Java, C#).

适合你,如果使用TDD并希望保持架构整洁

/ 通过 npx 安装 校验哈希
npx oh-my-skill add lexler/skill-factory/growing-outside-in-systems
/ 通过 bash 安装
curl -fsSL https://oh-my-skill.com/install.sh | bash -s -- lexler/skill-factory/growing-outside-in-systems
/ 已经装过?验证本机副本,不用重装
npx oh-my-skill verify lexler/skill-factory/growing-outside-in-systems
安装目标可用 --agent / --scope 或 --to 明确指定;省略时只会在唯一已存在的 agent 目录上自动选择,零命中或多命中会停止并提示。content_hash 缺失或不一致均拒装。
223GitHub stars
~1.6K最小装载
~5.9K含声明引用
~5.9K文本包总量
索引托管

怎么用

商店整理自技能原文 · 版本 2eae60e · 表述以原文为准
它做什么

使用外部驱动TDD和六边形架构开发功能:从编写验收测试开始,经过内联代码、内存假对象、接口提取,最后延迟实现真实I/O。

什么时候触发

当你要构建功能、编写测试或设计后端服务,以及提到“TDD”、“六边形架构”、“端口和适配器”等关键词时触发。

装好后可以这样说
触发外层循环
遵循涌现设计流程
确保I/O在边界外
技能原文 SKILL.md作者撰写 · Apache-2.0 · 2eae60e

STARTER_CHARACTER = 🔴🟢

Outside-In TDD with Hexagonal Architecture

Build features by driving design from the outside in. Every feature starts with a failing acceptance test. Design emerges through disciplined Red-Green-Refactor cycles. Infrastructure is deferred until the domain API is proven.

Unlike inside-out TDD with mocks, this approach tests behavior at the boundary — not implementation details — making the suite refactor-friendly by design. See [methodology.md](references/methodology.md#why-outside-in-over-regular-tdd).

For canonical terms used throughout, see [references/glossary.md](references/glossary.md).


The Two Loops

Outer loop (Acceptance test): Write a failing test scoped at the service/system boundary. This test exercises integration across Bounded Contexts using in-memory adapters. It defines "done."

Inner loop (Red-Green-Refactor): Cycles inside a Bounded Context to make the outer test pass. Drop into this loop only to implement what the acceptance test demands.

Every feature starts from the outside in. The acceptance test drives the process.


Test Priorities

Acceptance and component tests are the primary instruments. Unit tests are the exception.

  • Acceptance tests — service/system boundary, in-process, in-memory adapters; read as specifications
  • Component tests — single Bounded Context; drives internal module design via in-memory adapters
  • Unit tests — exception only: well isolated ,genuinely complex, algorithmic, or combinatorial logic

See [testing-strategy.md](references/testing-strategy.md) for full definitions, the testing matrix, and contract test patterns.


The Testing Matrix

| | Fast | Slow | |---|---|---| | Large Scope | Acceptance & Component — daily driver | E2E — minimize | | Small Scope | Unit — use sparingly | Contract — CI only |

Sub-second feedback is non-negotiable. If tests take seconds, the team stops refactoring and the system decays.


Emergent Design Workflow

Follow this sequence strictly within each Bounded Context:

  1. Inline — implement logic naively inside business code; use local variables, lists, maps; no abstractions
  2. In-Memory adapter — once behavior is verified, extract logic into a dedicated in-memory adapter implementation
  3. Interface — extract the adapter interface from what actually emerged (not theoretical guesses)
  4. Checkpoint: all types in the interface must live inside the hexagon
  5. I/O Checkpoint: if no I/O and not out-of-process → keep inside hexagon; do not create a port
  6. Deferred I/O — implement the real adapter (database, network, file system) only after the API is mature
  7. Refactor the inline code inside the hexagon

The sequence is non-negotiable. Each step collects evidence about what the adapter actually needs. See [methodology.md](references/methodology.md) for detailed rationale and the walking skeleton.


Hexagonal Architecture

The Domain Layer is the center. All I/O lives behind adapter interfaces at the boundary.

Dependency Rule: Infrastructure(adapters) → Application(ports) → Domain (outer depends on inner, never reverse)

I/O Classification Rule: if it does not do I/O and does not run out-of-process → belongs inside the hexagon; otherwise → adapter.

Port-referenced types must live inside the hexagon. If a port signature references a type in the adapter layer, the hexagon depends outward — a violation.

Naming:

  • Ports: For[Something] (e.g., ForCalculatingTaxes, ForGettingTaxRates)
  • Adapters: [Something]Adapter (e.g., WebUIAdapter, SQLDatabaseAdapter)

See [folder-structure.md](references/folder-structure.md) for full folder structure, private/public hexagon split, cross-hexagon dependency rule, adapter design patterns, and test seams.


In-Memory Fakes, Not Mocks

Use in-memory fakes for all adapter boundaries. Never mocks or stubs for domain-level testing.

Fakes are real implementations backed by simple data structures (maps, lists). They have actual behavior. Mocks only verify call sequences — they couple tests to implementation details and break on every refactor.

Contract tests verify the real adapter matches the fake's behavior. See [testing-strategy.md](references/testing-strategy.md).


Walking Skeleton

For new projects or major new components: build a minimal end-to-end implementation first to pay integration cost upfront. Once upright, pivot to the emergent design workflow. See [methodology.md](references/methodology.md).


Composition Root (Configurator)

Wires all adapter interfaces at startup. Used in two contexts:

  • Production: real adapter implementations (database, network, file system)
  • Tests: in-memory adapter implementations → fast, deterministic test harness

The same business logic runs in both contexts — only the adapters differ.


Feature Implementation Order
  1. Write a failing acceptance test — defines "done"
  2. Drop into the inner loop — Red-Green-Refactor
  3. Follow the emergent design sequence — Inline → In-Memory → Interface → Deferred I/O
  4. Add component tests if needed — when a Bounded Context grows complex
  5. Add unit tests only when justified — complex algorithms, combinatorial logic
  6. Implement real adapters last — verify with contract tests against in-memory fakes

Listen to the Tests

Difficulty writing a test is a design signal, not a skill problem:

  • Hard to set up → too many dependencies; split or rethink adapter boundaries
  • Hard to assert on → API is hiding or tangling information callers need
  • Fragile, breaks on refactor → testing implementation details; step up to component/acceptance test
  • Slow → hitting real I/O; find the missing adapter boundary

Do not fight the tests. Reshape the code until the test is easy to write.


Reference Documentation
  • [glossary.md](references/glossary.md) — canonical terms
  • [folder-structure.md](references/folder-structure.md) — folder structure, private/public hexagon, cross-hexagon rules, adapter patterns, test seams
  • [testing-strategy.md](references/testing-strategy.md) — full testing matrix, acceptance/component test rules, contract test pattern
  • [methodology.md](references/methodology.md) — why outside-in over regular TDD, walking skeleton, emergent design deep-dive, listen to the tests, anti-patterns
Sources
按 Apache-2.0 许可原样转载,未经改动 · 在 GitHub 查看 →

评论

登录即可评论;带「已验证安装」的,是发布者名下有本店的安装或持有记录。